Site improvements: project phasing to maintain pedestrian access and fire lane; utility scanning/811 and potholing; erosion control/SWPPP; protection of existing landscaping, flatwork, and utilities; survey verification; tree protection; concrete sawcut/demolition; irrigation demolition/safe-off; landscaping demolition; Class 2 aggregate base and compaction; flatwork, curbs, gutters, truncated domes; gravel infill; signage removal/relocation and new signage; curb-stop removal/relocation; asphalt grinding/removal; 12-inch AC deep lift and 1.5-inch AC overlay; striping removal/blackout and new striping; vehicle/pedestrian traffic control; phasing; disposal/dump fees; surface protection/repair; daily record drawings; daily cleanup/security; and close-out documents including a 1-year warranty.