Completed Project

Grant West HS - Site Beautification

Duties Performed

Site improvement/landscape-concrete work: mobilization; layout from surveyed corners, grid lines and elevations; installation of embedded miscellaneous metals, anchor bolts, hold-downs and HSS bolt sets; subgrade preparation to required elevation; vertical curb/gutter, valley gutter, curb with fence, concrete curb bands, concrete band, concrete seatwalls, Type 1 paving, thickened paving, flagpole foundations, bollard foundations, truncated domes, concrete PCC work, curb ramps, accessible curb ramps, reinforcement and dowels. Contract also includes listed alternates for monument sign furnish/install, two flag poles, four concrete benches, three concrete seating units, and a nailer board furnish/install.

Year Performed

2025

Job Location

Owner

Twin River Unified School District

General Contractor

KYA Services, LLC

Our Role

Subcontractor

Total Contract Amount

$ 419,666.00