Prime contractor for the City of Elk Grove. Work shown in the final progress payment/bid schedule includes mobilization; traffic control; construction/project signs and message boards; SWPPP preparation and implementation; ESA and tree-protection fencing; construction surveying and utility locating; tree removal; clearing and grubbing; removal of asphalt/base, concrete sidewalk/curb ramps, curb and gutter, headers, roadside signs, bollards, striping and markings; utility-box adjustment; earthwork and grading; topsoil, shoulder backing, decomposed-granite shoulders, weed-intrusion fabric and root barriers; aggregate base; storm-drain inlets and HDPE pipe; flared end sections; filter fabric and rock slope protection; concrete curb ramps, curb/gutter, trail and walkway, detectable warning surfaces; street sweeping; hot-mix asphalt and base-failure repairs; crack treatment; Type II micro-surfacing; materials sampling/testing; traffic striping, legends/markings, pavement markers, painted curb and green bike-lane markings; roadside signs and pedestrian barricades; video detection equipment; RRFB equipment/signs; segmental block retaining wall; pedestrian guardrail; irrigation modifications; sod, plants, trees, mulch, plant establishment and hydroseed. Final documents also reflect change-order work/quantity balancing, including unsuitable material, manmade buried objects, curb-ramp revisions, and extended base-failure repairs.