Completed Project

SMCS IR Replacement – Asphalt

2801 L Street, Sacramento, CA 95816

Duties Performed

Asphalt place and finish scope for the Ose Adams Interventional Radiology Replacement Project: site visit and field verification; material delivery/unloading; submittals and samples; masking/protection of existing conditions; preparation, placement, and finishing of asphalt connecting existing asphalt to the new concrete ramp; coordination of required inspections; and 1-year material/labor warranty for closeout.

Year Performed

2025

Job Location

2801 L Street, Sacramento, CA 95816

Owner

Sutter Medical Center Sacramento

General Contractor

The Boldt Company

Our Role

Subcontractor

Total Contract Amount

$ 5,446.72