Completed Project

Valley Oaks Elementary - New Classroom Building H

21 C Street, Galt, CA 95632

Duties Performed

Earthwork, utilities, and paving: subgrade preparation and aggregate base; rough/finish grading, import, off-haul, backfill, compaction and soil treatment; asphalt patch paving; site utilities including piping, bedding, valves, boxes, backflow preventers, drains, inlets, manholes and related accessories; trenching, shoring/sheeting/bracing, trench plates and safety protection; utility verification and coordination; dewatering/pumping/mucking as needed; traffic/pedestrian control; temporary ADA asphalt walkway; construction SWPPP erosion control; dust control and daily street sweeping/housekeeping; and final cleanup.

Year Performed

2025

Job Location

21 C Street, Galt, CA 95632

Owner

Galt Joint Union Elementary School District

General Contractor

S+B James Construction California, Inc.

Our Role

Subcontractor

Total Contract Amount

$ 316,416.00